1. 首页
  2. 英语周报

英语周报2023-2024学年上学期高三山西师范大学主管6期参考答案

英语周报2023-2024学年上学期高三山西师范大学主管6期参考答案

英语周报2023-2024学年上学期高三山西师范大学主管6期参考答案

The weather turned out to be fine yesterday.I________the trouble to carry the umbrella with me.

A.couldn’t have taken B.mustn’t have taken

C.needn’t have taken D.didn’t need to take

 

英语周报2023-2024学年上学期高三山西师范大学主管6期参考答案试题答案

C

【解析】考查情态动词。句意为:昨天天气很好,我本不必麻烦随身带伞的。根据句意可知C项正确。needn’t have done本没有必要做而做了。

答案: C

 

The Sydney Opera House is a very famous building in the world. It has become Sydney's best-known landmark and international symbol. The Opera House with a " sailing roof" was designed by a famous Danish architect (丹麦建筑大师),Utzon. The base for the building was started in 1959, years before the designs were finished. Utzon spent four years designing the Opera House. In 1962, the designs were finalized (定稿) and the construction began. In 1967, they started the decoration inside. It took 14 years in total to build the Opera House. Queen Elizabeth II officially opened it on October 20th, 1973.
 The Sydney Opera House cost around $100 million and was paid for by the public 6,225 square meters of glass was used to build it. The Opera House includes 1,000 rooms. It is 185 meters long and 120 meters wide. The building's roof sections weigh about 15 tons. Each year, this fantastic building attracts 200,000 tourists to come for a visit or enjoy events in it.
  The Opera House reaches out into the harbour (港湾). It is amazing and unforgettable, offering people a strong sense of beauty.

  1. 1.

    The designer of the Sydney Opera House was from _______.

    1. A.America
    2. B.Australia
    3. C.England
    4. D.Denmark(丹麦)
  2. 2.

    Building the Sydney Opera House lasted__________.

    1. A.from 1959 to 1973
    2. B.from 1962 to 1973
    3. C.from 1959 to 1967
    4. D.from 1962 to 1967
  3. 3.

    _______ paid for the cost of the building of the Sydney Opera House.  

    1. A.Utzon
    2. B.The public
    3. C.Queen Elizabeth II
    4. D.The government
  4. 4.

    Which is the best title for the passage?  

    1. A.Sailing Roof
    2. B.Travelling in Sydney
    3. C.The Sydney Opera House
    4. D.The Opening of the Opera House

英语周报2023-2024学年上学期高三山西师范大学主管6期参考答案试题答案DDBC
试题分析:文章介绍了悉尼歌剧院的历史和建设情况。
1.D 细节题。根据The Opera House with a  sailing roof was designed by a famous Danish architect (丹麦建筑大师),Utzon.说明设计师来自丹麦,故D正确。
2.D 细节题。根据In 1962, the designs were finalized (定稿) and the construction began. In 1967, they started the decoration inside. It took 14 years in total to build the Opera House.说明悉尼歌剧院是从1962开始建到1967年建成,故D正确。
3.B 细节题。根据第二段1,2行The Sydney Opera House cost around $100 million and was paid for by the public 6,225 square meters of glass was used to build it.说明悉尼歌剧院的建设费用是用公众出的牢固B正确。
4.C 主旨大意题。文章介绍了悉尼歌剧院的历史和建设情况。故C正确。
考点:考查了社会历史类阅读
点评:本文介绍了悉尼歌剧院的历史和建设情况,题目设置方面对细节题的考查较多。 <

原创文章,作者:adin1,如若转载,请注明出处:https://www.csxinyihg.com/?p=161

联系我们

400-800-8888

在线咨询:点击这里给我发消息

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息